Conceptual aerial rendering of SuperPorto São Paulo showing offshore terminal islands and their dedicated coastal connections
24°19'S · 47°00'WPeruíbe · São Paulo · BrazilGreenfield deep-water platform

Infrastructure command system · SP-01

Engineering the next gateway to Brazil.

A US$4.9 billion greenfield platform conceived around offshore terminal islands approximately 3 km from the coast.

Enter the investment case
Phase 1 capacity~6.0MTEU / year
Development CAPEX~US$4.9BIllustrative
Stabilized EBITDA~US$940MIllustrative / year
Stabilized enterprise valueUS$9–18BScenario range
VESSEL CLASS ULCVDESIGN DRAFT ≥25MOFFSHORE POSITION ~3 KMRAIL STRATEGY ON-DOCKCONTROL LAYER DIGITAL TWIN
SP / 01

Not a port expansion.
A logistics dominance platform.

SuperPorto São Paulo is conceived as a system-level response to the structural limits of Brazil's principal container and export corridor.

Located approximately 70 kilometres south of Santos, the project places its principal maritime infrastructure on offshore islands approximately 3 km from the coast—accessing deep water while preserving a greenfield layout unconstrained by legacy terminal geometry.

Its modular architecture aligns capacity release with commercial commitments, financing milestones and disciplined capital allocation.

SP / SYSTEM ARCHITECTURE

One perimeter.
Five synchronized layers.

Designed from first principles as an automation-first industrial asset—not as a collection of disconnected terminals.

Integrated architecture of the port, logistics, rail, energy and industrial platform
Conceptual integrated architectureSubject to detailed engineering and licensing
01

Maritime

Natural deep-water approach, ULCV-ready berths and automated vessel interfaces.

02

Terminal

Remote-controlled equipment, predictive maintenance and high-density yard operations.

03

Rail-on-dock

Direct inland connectivity designed to reduce truck dependence and cargo dwell time.

04

Industrial

ZPE, energy, processing and circular-economy activities inside one controlled perimeter.

05

Digital

Integrated control tower, digital twin and data-led orchestration across the asset.

Technology mandate

Infrastructure that senses, predicts and responds.

The operating concept places automation, data and energy efficiency into the engineering basis of the asset—supporting safer operations, higher equipment utilization and lower friction across the cargo journey.

24/7Integrated control tower
Digital twinPlanning and asset intelligence
Rail-on-dockDirect multimodal transfer
Automation-firstTerminal design philosophy
Integrated control layer

One source of operational truth.

A common data architecture is conceived to connect marine planning, yard orchestration, rail dispatch, energy use and asset health.

Conceptual port master plan used as the digital twin operating layerMaritime interfaceAutomated yardRail-on-dockZPE + industry
System architecture5 / 5 layers connected
Planning horizon40+ yearsLong-duration asset
Capacity releaseDemand-ledModular stage gates
Conceptual interface illustrating the project's intended integrated operating philosophy. Not live operational data.
Engineering advantage

Deep water.
Purpose-built offshore.

~3kmIndicative distance
from the coastline

The concept positions specialized terminal islands in naturally deep water, linked to the onshore logistics and industrial platform by dedicated access corridors.

Maritime interface
≥25m
Target operational draft
Configuration
Offshore
Modular terminal islands
Land connection
Dedicated
Elevated access corridors

Conceptual engineering subject to hydrographic survey, geotechnical investigation, environmental licensing and detailed design.

Investment framework

Underwritten through milestones.
Scaled through demand.

Current stageDevelopment

The immediate programme is focused on site control, licensing and bankable engineering before major construction capital is released.

01

Constrained corridorStructural capacity and access limitations in Brazil's principal container gateway.

02

Greenfield geometryPurpose-built offshore configuration without legacy terminal constraints.

03

Integrated value captureContainers, rail, ZPE, energy and industry within one platform strategy.

04

Demand-led phasingCapacity release aligned with commercial commitments and financing gates.

Enterprise value rangeUS$9–18B

Illustrative stabilized valuation across project scenarios.

Annual revenue~US$1.5B
Annual EBITDA~US$940M
EBITDA margin~63%
Asset horizon40+ years

Illustrative scenarios, not forecasts or guarantees. Subject to licensing, final engineering, commercial contracts, financing and ramp-up. Valuation range reflects alternative stabilized operating and market scenarios.

Development dashboard

Evidence before expansion.

The programme advances through discrete technical, regulatory, commercial and financing gates. Status descriptions indicate the present strategic focus and do not represent regulatory approval.

01

Site + licensing

Active workstream

Land strategy, permitting pathway and environmental studies.

02

Bankable engineering

Current priority

Hydrographic, geotechnical and reference-design work packages.

03

Commercial formation

Partner dialogue

Engagement with operators, cargo interests and industrial anchors.

04

Capital structure

Phased approach

Development capital followed by milestone-based project financing.

Primary execution risks

Licensing · engineering validation · commercial formation · financing · construction delivery

Mitigation architecture

Stage gates · modular phasing · independent studies · anchor commitments · disciplined capital release

Capital discipline

Modular by design.
Institutional by execution.

Capital is released against technical, regulatory and commercial stage gates—preserving flexibility while building toward full platform value.

01
Current focus

Development

Licensing, site control and bankable engineering

02
Anchor build

Phase 01

~6.0M TEU annual container capacity

03
Demand-led

Expansion

10–12M TEU potential at full configuration

04
Long duration

Platform

ZPE, energy and industrial value capture

Controlled access process
  1. 01Initial enquiry
  2. 02Counterparty qualification
  3. 03Confidentiality framework
  4. 04Relevant materials released

Project enquiries: investors@superportosp.com

Strategic engagement

Build the next
gateway to Brazil.

Engagement with strategic operators, infrastructure investors and development partners is conducted through a controlled diligence process.

Request investor access